How to Apply Online for a New RLNG Gas Connection in Pakistan
As Pakistan shifts toward cleaner and more efficient energy options, RLNG Gas Connection (Re-Gasified Liquefied Natural Gas) has become an increasingly important fuel source. With growing domestic demand and limited conventional natural gas reserves, RLNG offers a reliable alternative for households across the country.
Using RLNG gas connection for domestic purposes provides several benefits, including improved supply stability, environmental friendliness, and better efficiency compared to traditional fuels like LPG.
In this guide, we’ll walk you through the complete online application process for a new RLNG gas connection in Pakistan covering eligibility, required documents, fees, installation, troubleshooting, and more.
What is RLNG and Why Choose an RLNG Gas Connection?
RLNG (Re-Gasified Liquefied Natural Gas) is LNG that has been converted back into gaseous form for distribution through pipelines.
It differs from conventional natural gas mainly because:
- RLNG is imported and processed, whereas natural gas is sourced locally.
- RLNG typically offers more consistent supply due to managed imports.
- Quality and calorific value of RLNG are relatively stable.
Benefits of RLNG Over LPG and Other Fuels
- Safer and more stable supply compared to LPG cylinders
- No risk of cylinder leakage or refilling problems
- Direct pipeline connection adds convenience
- Cleaner combustion, producing fewer emissions
Eligibility for an RLNG Gas Connection
Applicants are eligible if:
- RLNG pipeline supply is available in their area
- Their property is legally owned or rented with proper documentation
- Building or residence meets safety and layout requirements set by SNGPL/SSGC
Pre-Application Requirements
Before applying online, make sure you have completed the following steps:
1. Confirm Network Availability
Check whether RLNG is available in your area by contacting:
- SNGPL (Sui Northern Gas Pipelines Limited)
- SSGC (Sui Southern Gas Company)
Availability depends on your region and RLNG infrastructure.
2. Prepare Required Documents
You will need:
- CNIC (front and back)
- Property ownership papers OR tenancy agreement
- Approved building plan (if applicable)
- NOC from the owner (for tenants)
- Any other supporting document requested by the gas company
3. Ensure Accurate Information
Make sure all details match your official documents.
Even minor errors can delay the survey or lead to application rejection.
Detailed Step-by-Step Online Application Process
Follow these steps to submit your online application:
Step 1: Visit the Official Portal
Go to the RLNG gas connection portal of SNGPL or SSGC (depending on your location).
Step 2: Select Application Type
Choose between:
- Normal RLNG Connection
- Fast Track RLNG Connection (higher priority but may involve different charges)
Step 3: Fill Out the Online Form
Enter accurate:
- Personal information
- CNIC details
- Property address
- Property type and number of gas appliances
Step 4: Upload Required Documents
Scan and upload documents clearly.
Make sure they meet size and format requirements mentioned on the portal.
Step 5: Submit the Form
After submission, you will receive:
- A reference number
- Confirmation via SMS and/or email
Keep this reference number safe for tracking your application.
Survey and Approval Procedures
After your application is submitted:
Survey Visit
A representative from SNGPL or SSGC will visit your property to:
- Verify documents
- Inspect the site
- Check feasibility of installation
Approval Timeline
Approval depends on:
- Successful verification
- Availability of infrastructure
- Accuracy of your application details
Once approved, the company will notify you through SMS or email.
Fees, Deposits, and Payment Methods
Common Charges Include:
- Security deposit
- Meter charges
- Pipeline connection charges
- Stamp duty and affidavit (if required)
Exact costs may vary based on location and the type of RLNG connection.
Payment Methods
Most gas companies accept:
- Banks
- Mobile wallets
- Online banking
- Designated payment centers
Make sure to pay within the given deadline to avoid delays.
Installation Process and Activation
After Approval
You will need to arrange:
- Internal pipeline installation (usually done by a certified contractor)
Meter Installation
Once internal piping is complete and inspected, the gas company will install the meter.
Activation
After final checks:
- Your RLNG supply will be activated
- Your first sui gas bill will be generated according to usage
You can track your connection status online or via SMS updates.
Potential Issues and Troubleshooting
Common Causes of Delays or Rejection
- Incorrect or mismatched documents
- Network unavailability
- Errors in CNIC or property details
- Incomplete application form
Tips to Avoid Problems
- Double-check your documents
- Provide accurate contact information
- Ensure property access during survey
- Follow portal instructions carefully
Support Channels
Contact:
- SNGPL/SSGC customer service
- Local office
- Official helpline
- Online complaint portal
Conclusion
Applying for an RLNG domestic gas connection in Pakistan has become easier thanks to online systems and centralized verification processes. RLNG provides a clean, safe, and reliable energy solution for modern households, and by following the correct steps with proper documents, you can secure your connection smoothly.
Make sure to review all requirements carefully and follow the guidelines to avoid delays. For further assistance, always refer to the official SNGPL or SSGC support channels.